RECENT PROJECTS
TRANSMISSION – DISTRIBUTION - SUBSTATIONS
In 2018 PTI performed over 100 projects for various power utilities in the western United States ranging from $10 thousand to $4 million in project size. Below are a few notable projects that showcase our ability to perform sizable, complex projects on spec, on schedule, and on budget every time. PTI's team understands the need for professional and collaborative efforts to achieve the results you need and deserve.
Lyons Transmission Line Construction
Owner: PacifiCorp
Project Value: $1,104,000
Scope of Work: Complete construction of new 69kV transmission line with distribution under-build. Replace distribution cross arms and transformers. Transfer all loads and energize.
Parkrose Substation Conversion
Owner: PacifiCorp
Project Value: $3,570,000
Scope of Work: Expand the existing substation along with adding 2 new switchgear and modify the existing transformer and bus configuration. Modify existing feeders in substation.
Mason Substation Rebuild
Owner: Mason County PUD No. 3
Project Value: $967,000
Scope of Work: Demolition of existing substation, construct concrete pads, and foundations for new substation. Erect and install steel support systems, electrical bus, all electrical equipment, and control wiring. Complete rebuild of Mason Substation.
Discovery Substation Solutions
Owner: Google Inc.
Project Value: $589,000
Scope of Work: Trench and install conduits and underground vaults. Pull and terminate cables. Core drilling and cable testing support.
Jackson Hydro Protective Relay Panels
Owner: Snohomish County PUD No. 1
Project Value: $195,000
Scope of Work: Replaced relay panels and station annunciator panels at Jackson Hydro Generation Plant. Included all control wiring and terminations.
Celilo Converter Station
Owner: Bonneville Power Administration
Project Value: $1,650,000
Scope of Work: Replaced 20,000 feet of 13.2kV three phase UG feeder cables from Big Eddy Substation to Celilo Converter Station. Included all cable terminations and testing.
PUC Overhead Distribution Corrections
Owner: PacifiCorp
Project Value: $1,105,000 each year
Scope of Work: Inspect and correct PUC violations on distribution system throughout Oregon. Correct grounding at distribution poles, replace cross arms, correct spacing and clearances, replace guy wires and anchors, remove and replace energized wood pole structures.
Overhead Distribution Line Construction from Ogden, UT to Evanston, WY
Owner: Union Pacific Railroad
Project Value: $4,145,000
Scope of Work: Construct 46 Miles of 15kV overhead distribution line. Installed all transformers and services. Included underground boring, pad mount transformer installation and makeup, and disconnect racking systems.
Owner: PacifiCorp
Project Value: $1,104,000
Scope of Work: Complete construction of new 69kV transmission line with distribution under-build. Replace distribution cross arms and transformers. Transfer all loads and energize.
Parkrose Substation Conversion
Owner: PacifiCorp
Project Value: $3,570,000
Scope of Work: Expand the existing substation along with adding 2 new switchgear and modify the existing transformer and bus configuration. Modify existing feeders in substation.
Mason Substation Rebuild
Owner: Mason County PUD No. 3
Project Value: $967,000
Scope of Work: Demolition of existing substation, construct concrete pads, and foundations for new substation. Erect and install steel support systems, electrical bus, all electrical equipment, and control wiring. Complete rebuild of Mason Substation.
Discovery Substation Solutions
Owner: Google Inc.
Project Value: $589,000
Scope of Work: Trench and install conduits and underground vaults. Pull and terminate cables. Core drilling and cable testing support.
Jackson Hydro Protective Relay Panels
Owner: Snohomish County PUD No. 1
Project Value: $195,000
Scope of Work: Replaced relay panels and station annunciator panels at Jackson Hydro Generation Plant. Included all control wiring and terminations.
Celilo Converter Station
Owner: Bonneville Power Administration
Project Value: $1,650,000
Scope of Work: Replaced 20,000 feet of 13.2kV three phase UG feeder cables from Big Eddy Substation to Celilo Converter Station. Included all cable terminations and testing.
PUC Overhead Distribution Corrections
Owner: PacifiCorp
Project Value: $1,105,000 each year
Scope of Work: Inspect and correct PUC violations on distribution system throughout Oregon. Correct grounding at distribution poles, replace cross arms, correct spacing and clearances, replace guy wires and anchors, remove and replace energized wood pole structures.
Overhead Distribution Line Construction from Ogden, UT to Evanston, WY
Owner: Union Pacific Railroad
Project Value: $4,145,000
Scope of Work: Construct 46 Miles of 15kV overhead distribution line. Installed all transformers and services. Included underground boring, pad mount transformer installation and makeup, and disconnect racking systems.